SIEMENS
4/29
Siemens D 31 N · March 2016
4
SINAMICS G120C compact inverters
0.55 kW to 18.5 kW (0.75 hp to 25 hp)
Supplementary system components
> Basic Operator Panel BOP-2
■
Overview
Basic Operator Panel BOP-2
The Basic Operator Panel BOP-2 can be used to commission
drives, monitor drives in operation and input individual parameter
settings.
Commissioning of standard drives is easy with the menu-
prompted dialog on a 2-line display. Simultaneous display of the
parameter and parameter value, as well as parameter filtering,
means that basic commissioning of a drive can be performed
easily and, in most cases, without a printed parameter list.
The drives are easily controlled manually using directly assigned
navigation buttons. The BOP-2 has a dedicated switchover
button to switch from automatic to manual mode.
Diagnostics can easily be performed on the connected inverter
by following the menus.
Up to two process values can be numerically visualized
simultaneously.
BOP-2 supports standard commissioning of identical drives. For
this purpose, a parameter list can be copied from an inverter into
the BOP-2 and when required, downloaded into other drive units
of the same type.
The operating temperature of the BOP-2 is 0 °C ... 50 °C
(32 °F... 122 °F).
■
Benefits
•
Shorten commissioning times – Easy commissioning of
standard drives using basic commissioning wizards (setup)
•
Minimize standstill times – Fast detection and rectification of
faults (Diagnostics)
•
Greater transparency in the process – The status display of
the BOP-2 makes process variable monitoring easy
(Monitoring)
•
Direct mounting on the inverter (also see IOP)
•
User-friendly user interface:
- Easy navigation using clear menu structure and
clearly assigned control keys
- Two-line display
■
Selection and ordering data
Description
Article No.
Basic Operator Panel BOP-2
6SL3255-0AA00-4CA1
Accessories
Door mounting kit
For mounting an operator panel in control
cabinet doors with sheet steel thicknesses
of 1 ... 3 mm (0.04 ... 0.12 in)
IP54 degree of protection for IOP
IP55 degree of protection for BOP-2
Included in the scope of delivery:
• Seal
• Mounting material
• Connecting cable (5 m/16.4 ft long, also
supplies voltage to the BOP-2 directly via
the SINAMICS G120C compact inverter)
6SL3256-0AP00-0JA0
© Siemens AG 2016