SIEMENS
Services and documentation
SINAMICS GM150, SINAMICS SM150
Perfectly setup for global service
over the complete lifecycle
10/13
Siemens D 12 · 2012
10
■
Extension of the liability for defects
Conditions for an extension of the liability for defects:
•
For all extension periods of liability for defects, for new and
subsequent orders, the final destination of the product must
be known.
The EUNA process is available to obtain this information at
/euna
, which must be performed by your
local Siemens contact person.
•
For all 4 and 5
year extension periods of the liability for defects
(Q84/9LD1740-0AA48, Q85/9LD1740-0AA60), this is only
possible in conjunction with a corresponding maintenance
contract with regular inspections. This maintenance contract
must be signed and concluded with the responsible service
department.
This must be documented using the EUNA procedure at
/euna
, which must be performed by your
local Siemens contact person.
•
The general storage conditions described in the operating
instructions must be adhered to, especially the specifications
for long-term storage.
•
Commissioning must be performed by appropriately qualified
personnel. When making liability for defect claims, under
certain circumstances, it may be necessary to submit the
commissioning report to the department making the decision.
•
Periodic maintenance must be performed in accordance with
the specifications of the operating instructions. When making
liability for defect claims, under certain circumstances, it may
be necessary to submit the corresponding maintenance
documentation and history.
•
The operating conditions correspond to the specifications
in the operating instructions, the installation instructions or
specific conditions laid down in the contract.
•
The extended liability for defects excludes wearing parts such
as fans or filters. This does not apply if it can be clearly proven
that the failure is a premature one.
•
Otherwise, the general conditions regarding liability for
defects applies as agreed in the delivery contract.
© Siemens AG 2012