SIEMENS
Description of options
SINAMICS GM150, SINAMICS SM150
Description of options
6/13
Siemens D 12 · 2012
6
■
Options
E87
Additional analog outputs (isolated)
With option
E87
an additional TM31 Terminal Module is avail-
able. Its analog outputs are isolated. Multirange transformers are
used (setting range: 0 V to 10 V; 0 mA to 20 mA or 4 mA to
20 mA).
Note:
Option
E87
cannot be combined with option
G62
(second
additional TM31 Terminal Module).
F03, F29, F73, F77, F79, F97
Converter acceptance inspections in presence of customer
Option
Description
F03
Visual acceptance
The checks are carried out with the converter deenergized.
The following is included in the scope of the acceptance tests:
• Check of degree of protection
• Check of equipment (components)
• Check of equipment identifier
• Check of clearance and creepage distances
• Check of cables
• Check of customer documentation
• Submitting the acceptance report
F29
Noise measurement under no-load conditions (SINAMICS GM150 and SINAMICS SM150 in an air-cooled IGBT version)
With option
F29
, the sound pressure level of the converter is measured under no load conditions with the continuously operating fans
switched on.
F73
Functional acceptance of converter with inductive load
1)
After the visual inspection with the converter off, the converter is connected to rated voltage. Rated current flows in an inductive load
at an output frequency of 5 Hz (without connector motor) on the converter output side.
The following is included in the scope of the acceptance tests:
• Visual inspection as described for option
F03
• Check of power supply
• Check of protective and monitoring devices (simulation)
• The fan is checked (for water cooling: cooling circuit elements in the converter)
• Precharging test
• Functional test with inductive load at rated voltage and rated current
• Submitting the acceptance report
F77
Acceptance of the converter insulation test
1)
The following is included in the scope of the acceptance tests:
• High-voltage test
• Measurement of insulation resistance
Option
F77
can only be ordered in connection with options
F73
.
F79
Test of the interface between the converter and customer equipment (5 hours)
1)
The analog, digital and serial interfaces are tested according to their preassignment described in Chapter 8.
For additional test requirements, option
F97
must be selected.
Option
F79
can only be ordered in connection with option
F73
.
1)
As a result of the local situation and the dimensions of the converter,
the acceptance is always performed using a basic unit comprising a
Line Module and a Motor Module.
© Siemens AG 2012