SINAMICS G150
Drive converter cabinet units
75 kW to 2700 kW
E11 to E71
Individual certification of the converter
The individual certification of the converter by the relevant certi-
fication body contains the expansions described in option
M66
.
Note:
It is not possible to combine several individual certificates.
F03, F71, F75, F77, F97
Converter acceptance tests with the customer present
F72, F74, F76
Converter acceptance tests without the customer present
G20
CBC10 Communication Board
The CBC10 Communication Board is used to connect the
CU320-2 Control Unit and thus the SINAMICS G150 to the CAN
(Controller Area Network) protocol. The associated driver soft-
ware fulfils the standards of the following CANopen specification
of the CiA organization (CAN in Automation):
•
Communication profiles according to DS 301
•
Drive profile according to DSP 402
(in this case Profile Velocity Mode)
•
EDS (Electronic Data Sheet)
according to DSP 306
•
Operational state signaling according to DSP 305
The CBC10 Communication Board is inserted into the option slot
on the CU320-2 Control Unit. The CAN interface on the CBC10
has two SUB-D connections for input and output.
For a description of the CBC10 Communication Board, see
SINAMICS G130 converter built-in units, Supplementary system
components.
G33
CBE20 Communication Board
The CBE20 Communication Board is required when:
•
A SINAMICS G130 or SINAMICS G150 converter, equipped
with a CU320-2 DP (PROFIBUS) Control Unit, is to be
connected to a PROFINET IO network
•
SINAMICS Link is to be used to directly exchange data
between several CU320-2 DP (PROFIBUS) or CU320-2 PN
(PROFINET) Control Units without using a higher-level control
system.
With the CBE20 Communication Board, a SINAMICS G130 or
a SINAMICS G150 is a PROFINET IO device in the sense of
PROFINET and offers the following functions:
•
PROFINET IO device
•
100 Mbit/s full duplex
•
Supports real-time classes of PROFINET IO:
- RT (Real-Time)
- IRT (Isochronous Real-Time), minimum send cycle 500
μ
s
•
Connects to controllers as a PROFINET IO device according
to the PROFIdrive profile
•
Standard TCP/IP communication for engineering processes
using the STARTER commissioning tool
•
Integrated 4-port switch with four RJ45-B sockets based on
PROFINET ASICs ERTEC400. The optimum topology (line,
star, tree) can therefore be configured without additional
external switches.
The CBE20 Communication Board is inserted into the option slot
of the CU320-2 Control Unit.
For a description of the CBE20 Communication Board, see
SINAMICS G130 converter built-in units, Supplementary system
components.
Order code
Description
E11
Individual certificate from Germanische Lloyd (GL)
E21
Individual certificate from Lloyds Register (LR)
E31
Individual certificate from Bureau Veritas (BV)
E51
Individual certificate from Det Norske Veritas (DNV)
E61
Individual certificate from American Bureau of Shipping (ABS)
E71
Individual certificate from Chinese Classification Society (CCS)
Option
Description
F03
Visual acceptance
The tests are carried out with the converter de-energized.
The following is included in the scope of the acceptance tests:
• Check of degree of protection
• Check of equipment (components)
• Check of equipment identifiers
• Check of clearance and creepage distances
• Check of cables
• Check of customer documentation
• Submission of the acceptance report
F71, F72
Function test without
connected motor
After the visual acceptance with the converter switched off, the
converter is connected to rated voltage. No current at the con-
verter output end.
The following is included in the scope of the acceptance tests:
• Visual acceptance as described for option
F03
• Check of power supply
• Check of protective and monitoring devices (simulation)
• Check of fans
• Pre-charging test
• Function test without connected motor
• Submission of the acceptance report
F74, F75
Function test with
test bay motor under no-load conditions
After the visual acceptance with the converter switched off, the
converter is connected to rated voltage. A small current flows
at the converter output end in order to operate the test bay
motor under no-load conditions.
The following is included in the scope of the acceptance tests:
• Visual acceptance as described for option
F03
• Check of power supply
• Check of protective and monitoring devices (simulation)
• Check of fans
• Function test with test bay motor under no-load conditions
• Submission of the acceptance report
F76, F77
Acceptance of the converter insulation test
The following is included in the scope of the acceptance tests:
• High-voltage test
• Measurement of the insulation resistance
• Submission of the acceptance report
F97
Customer-specific system acceptance tests (on request)
If acceptance tests are desired which are not covered by the
options
F03
,
F71/F72
,
F74/F75
or
F76/F77
, customer-specific
acceptance tests / supplementary tests can be ordered using
order code
F97
on request and following technical clarifica-
tion.